Call 0401 456 641
Two-storey home in Wattle Grove at dusk

About Heavenly Designs & Construction

A NSW licensed, people-focused main contractor. We build to the NCC and Australian Standards, backed by deep remedial experience.

About us

A solutions provider, not just a builder

No matter how we build, the right people in the right places are delivering the right solutions.

Heavenly Designs & Construction Pty Ltd is a NSW licensed main contractor based in Wattle Grove, led by Managing Director Monty Salama, delivering residential, commercial, remedial, renovation and heritage projects. Our principals bring the experience and knowledge to deliver the highest levels of safety, quality and integrity.

We use modern methods of construction and select the approach that suits each project, whether traditional, modern or a hybrid of more than one method. That choice is made with you at the start, based on your site, program and budget.

Compliance and quality

Built to the NCC and Australian Standards

Every project we deliver is planned, built and checked against the National Construction Code (NCC) and the Australian Standards (AS) that apply to it. Compliance is not something we look at only at the final inspection. It is built into how we price, program, supervise and sign off every stage of the job.

National Construction Code

We build to the NCC performance requirements and Deemed-to-Satisfy provisions for each building class, covering structure, fire safety, health and amenity, damp and weatherproofing, and energy efficiency.

Australian Standards

Materials, systems and workmanship are specified and installed in line with the relevant Australian Standards and the manufacturer's installation requirements.

Licensed and accountable

NSW contractor licence 350181C and Open builder licence 87554S. Our principals take personal responsibility for safety, quality and integrity on every site.

Australian Standards we work to

We follow the editions of these standards that are referenced by the NCC in force at the time of approval. Click a category to see each standard and how we apply it on site.

Waterproofing & wet areas5 standards
AS 3740Waterproofing of domestic wet areasBathrooms, showers, laundries and toilets: membrane extent, falls to waste, hob and set-down details, puddle flanges and junctions between floors and walls.
AS 4654.1Waterproofing membranes for external above-ground use: MaterialsSelecting membranes rated for UV exposure, movement and the substrate on balconies, roofs, podiums and planter boxes.
AS 4654.2Waterproofing membranes for external above-ground use: Design and installationFalls, upturns at walls and doors, overflows, termination and drainage details for balconies, decks and roofs.
AS 4858Wet area membranesPerformance requirements for the liquid and sheet membranes we install in wet areas.
AS 3958.1Ceramic tiles: Guide to the installation of ceramic tilesTile bedding, movement joints and substrate preparation so tiles stay bonded over the membrane.
Concrete, footings & masonry7 standards
AS 3600Concrete structuresConcrete strength, cover to reinforcement, curing and durability for slabs, columns, plinths and repairs.
AS 1379Specification and supply of concreteOrdering and checking the right concrete grade, slump and supply documentation on site.
AS/NZS 4671Steel reinforcing materialsReinforcing bar and mesh grades used in new concrete and concrete cancer repairs.
AS 2870Residential slabs and footingsSite classification and slab and footing design for houses and duplexes, as detailed by the engineer.
AS 3700Masonry structuresBrick and block walls, mortar, wall ties, cavity flashings, damp-proof courses and weep holes.
AS 4773.1 & .2Masonry in small buildings: Design and ConstructionMasonry detailing and workmanship for houses and other small buildings.
AS 2699Built-in components for masonry constructionWall ties, lintels and damp-proof courses with the right corrosion protection for the exposure.
Structure, framing & loads5 standards
AS 1684Residential timber-framed constructionWall, floor and roof framing sizes, bracing and tie-down for timber-framed homes.
AS 4100Steel structuresStructural steel beams, columns, lintels and connections, as designed by the engineer.
AS/NZS 4600Cold-formed steel structuresLight-gauge steel framing and purlins.
AS/NZS 1170Structural design actionsDead, live, wind and earthquake loads that the engineer's structural design is based on.
AS 4055Wind loads for housingWind classification of the site, which sets bracing, tie-down, windows and roofing.
Roofing, cladding, windows & glazing5 standards
AS 1562.1Design and installation of sheet roof and wall cladding: MetalMetal roof fixing, laps, minimum pitch and flashing details.
AS 2050Installation of roof tilesTile fixing, battens and pointing for tiled roofs.
AS 4200.2Pliable building membranes and underlays: InstallationSarking and wall wraps that manage condensation and keep water out of the frame.
AS 2047Windows and external glazed doors in buildingsWindow ratings for wind, water penetration and air infiltration, and their installation.
AS 1288Glass in buildings: Selection and installationSafety glass in doors, balustrades, bathrooms and low-level glazing.
Plumbing, drainage & services2 standards
AS/NZS 3500Plumbing and drainageWater services, sanitary drainage, stormwater, roof drainage and overflows. Carried out by licensed plumbers.
AS/NZS 3000Electrical installations (Wiring Rules)All electrical work carried out and certified by licensed electricians.
Site, safety & special conditions6 standards
AS 2601Demolition of structuresPlanning and carrying out demolition safely, including services disconnection and staging.
AS 1926.1Swimming pool safety: Safety barriers for swimming poolsPool fencing heights, gates and non-climbable zones on projects with pools.
AS 3660.1Termite management: New building workTermite barriers and management systems for new homes and additions.
AS 3959Construction of buildings in bushfire-prone areasConstruction requirements for the site's Bushfire Attack Level (BAL), where applicable.
AS 1428.1Design for access and mobilityAccessible entries, paths and facilities on commercial projects, where required.
AS 4586Slip resistance classification of pedestrian surfacesChoosing floor and balcony tiles with the right slip rating for wet and outdoor areas.
Codes, legislation & other references9 references
NCC Volume OneBuilding Code of Australia: class 2 to 9 buildingsApartments, commercial and other multi-unit buildings.
NCC Volume TwoBuilding Code of Australia: class 1 and 10 buildingsHouses, duplexes, townhouses, garages, sheds and pools.
ABCB Housing ProvisionsDeemed-to-Satisfy provisions referenced by NCC Volume TwoAcceptable construction practice for houses.
NCC Volume ThreePlumbing Code of AustraliaPlumbing and drainage requirements, used with AS/NZS 3500.
Home Building Act 1989 (NSW)Licensing, contracts, statutory warranties and insuranceThe basis of our residential building contracts, licences and warranties.
Environmental Planning and Assessment Act 1979 (NSW)Development and building approvalsDA, CDC, construction and occupation certificates.
Design and Building Practitioners Act 2020 (NSW)Duty of care, registered practitioners and declared designsApplies to class 2 buildings and remedial building work.
Work Health and Safety Act 2011 (NSW)WHS legislation and SafeWork NSW codes of practiceSafe work method statements, site safety and inductions.
The Burra CharterAustralia ICOMOS charter for places of cultural significanceThe conservation approach we follow on heritage projects.

The codes and standards that apply depend on the building class, location and scope of each project. We confirm them with your engineer, designer and certifier before work starts. Australian Standards are published by Standards Australia; the NCC is published by the Australian Building Codes Board (ABCB).

Why our remedial experience matters

We know what goes wrong, so we build it right

Remedial work is our specialty. We are regularly called in to fix leaking balconies, failed membranes, concrete cancer, cracked render and poorly flashed walls, often on buildings that are only a few years old. Every job means opening up the work and seeing exactly where shortcuts were taken.

That experience gives us the confidence and know-how to get it right the first time on every new build, renovation and heritage project. We build out the defects before they happen.

  1. Waterproofing done properly

    Correct falls, set-downs, hob heights, bond breakers, puddle flanges and upturns, installed to AS 3740 and AS 4654 and the membrane manufacturer's system.

  2. Flashings and cavities

    Continuous cavity flashings, sealed laps and clear weep holes, so water that gets behind the wall has a way out.

  3. Concrete that lasts

    The right concrete strength, cover to reinforcement and curing, so steel stays protected and concrete cancer does not start.

  4. Movement and expansion joints

    Joints placed and detailed where the structure needs to move, preventing cracked tiles, screeds and render.

  5. Hold points and inspections

    We inspect and photograph critical work, such as membranes, flashings and reinforcement, before it is covered up, and flood test wet areas where required.

  6. Quality products, compatible systems

    We use proven, certified products from trusted suppliers and never mix incompatible systems to save cost.

Your trusted building partner

Request our capability statement

Get an overview of our services, licences, sectors and recent projects, ready to share with your team or development partners.

Request capability statement